PRODUCTS

Customized production base of assembled integrated house

Installation Step 1

The bottom frame is connected with screws to the bottom cross beam and the bottom side cross beam, purlin 8*4 square pipes x9 are connected with screws
View Details

Installation Step 2

Each column is fixed with six sets of hexagon socket bolts, and the column screws do not need to be tightened
View Details

Installation Step 3

Measuring verticality of column with line drop and level
View Details

Installation Step 4

The top frame is connected to the top beam and the top side beam with screws, and the drain hole faces outward.
View Details

Installation Step 6

Install three horizontal square pipes and fix them at the welding angle of the top short beam.
View Details
< 1...161718...21 >