Email:
-
Language
The edge of the ceiling tile shall be hammered with rubber to seal and glue around. It is strictly prohibited to directly trample on the single roof tile during construction. It is necessary to prepare two square pipes to assist construction before stepping on the square pipe.
Installation of cement pressure plate surface with 1.6 plastic floor. Evenly laid.
Installation of wall panels and doors and windows
Contact Us
WhatsApp:
No. 58, Jiaoxiang Road, Jiaozhou City, Qingdao City, Shandong Province,China
Copyright©2023 Shandong Liansheng Intelligent Manufacturing Co., Ltd. All Rights Reserved. Powered by:300.cn Weifang| SEO | Urban substation